Lyra Storage
Storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 26INR0636
- In-service date
- (stated)
- Location
- Borden County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- JUNO BESS I
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Other - Battery Energy Storage”
- Connects at
- 345kV MULESHOE (#59922)Connection point1,646.6 MW active (4 of 4 projects).
At this site
2 records at Lyra SolarAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Lyra Solar | Solar | 600 | Contracted |
| Co-located, other technology high confidence | Lyra Storage this record | Storage | 500 | Contracted |
Also at this interconnection point (2)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Uva Creek Solar Solar, 302.2 MW, contracted at 345kV MULESHOE (#59922)
- Gail Mountain Solar Solar, 244.4 MW, contracted at 345kV MULESHOE (#59922)
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT