- Combustion
- In development
- 10 · 100 · 1,000 MW
Map
- Combustion
- In development
Mihta Askiy Data Center Project power station Phase 2 - ST: the source's site coordinate and 2 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mihta Askiy Data Center Project power station Phase 2 - ST
Gas, steam turbine
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Alberta, Canada
Details
Who’s behind it
- Developer
- Cree Ative Datacenter Corp GP
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, steam turbine source: “oil/gas / steam turbine”
At this site
3 records at Mihta Askiy Data Center Project power station Phase 2 - STAt this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Mihta Askiy Data Center Project power station Phase 2 - ST this record | Gas, steam turbine | 250 | Announced |
| Another phase high confidence | Mihta Askiy Data Center Project power station Phase 1 - GT1 | Gas, combustion turbine | 230 | Announced |
| Another phase high confidence | Mihta Askiy Data Center Project power station Phase 1 - GT2 | Gas, combustion turbine | 230 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Mihta Askiy Data Center Project power station Phase 1 - GT1 Announced | Gas, combustion turbine | 0.0 km | 230 |
| Mihta Askiy Data Center Project power station Phase 1 - GT2 Announced | Gas, combustion turbine | 0.0 km | 230 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.