overdue by 2.4 years (target Jun 28, 2024)

Gas, combustion turbine

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Queue position
PRO-000373
In-service date
(stated)
Location
Marston Vale 400kV Substation, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, combustion turbine source: “OCGT (Open Cycle Gas Turbine)”
Capacity (MW)
299 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 299 MW nameplate.
Connects at
Marston Vale 400kV SubstationConnection point889 MW active (3 of 3 projects).

Timeline

  • Observed as under construction in NESO (source status: “Under Construction/Commissioning”).
  • Stated In-service date stated by NESO. Passed 2.4 years ago; NESO still says under construction.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.

Sources

2 sources

Sources GEM · NESO

Supported by National Energy SO Open Data

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem