Show on map
Exact site not public
Map
Montreathmont Moor Forest in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Montreathmont Moor Forest
Solar + storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-001849
- In-service date
- (stated)
- Location
- Lunanhead GSP, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Details
Who’s behind it
- Developer
- Montreathmont Energy Centre Limited
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
- Connects at
- Lunanhead GSPConnection point34.4 MW active (1 of 1 projects).
Timeline
- Observed as permitted in NESO (source status: “Consents Approved”).
- Stated In-service date stated by NESO.
- NESO Transmission Entry Capacity (TEC) Register: status filed → permitted.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data