Show on map
Moonlight Flats Solar Power 1Moonlight Flats Solar Power 2 — Postponed · Solar · PA · 126.5 MW · 2.1 mi awayMoonlight Flats Solar Power 3 — Postponed · Solar · PA · 202.4 MW · 4.9 mi awayMineral Basin Solar Power — Announced · Solar · PA · 401.6 MW · 6.0 mi awayMPG Solar — Permitted · Solar · PA · 162 MW · 7.5 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Moonlight Flats Solar Power 1

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Clearfield County, Pennsylvania

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
67950 generator MFS1

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as announced in EIA-860M (source status: “(P) Planned for installation, but regulatory approvals not initiated”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Moonlight Flats Solar Power 2 Postponed Solar 2.1 mi 126.5
Moonlight Flats Solar Power 3 Postponed Solar 4.9 mi 202.4
Mineral Basin Solar Power Announced Solar 6.0 mi 401.6
MPG Solar Permitted Solar 7.5 mi 162

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution