Mount Signal Solar Farm III
Solar
As filed: MOUNT SIGNAL SOLAR FARM III
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- In-service date
- (stated)
- Location
- IMPERIAL County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Connects at
- Imperial Valley Substation 230 kVConnection point875 MW active (3 of 46 projects).
At this site
3 records at MOUNT SIGNAL SOLAR FARM IIIAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | MOUNT SIGNAL SOLAR FARM III this record | Solar | 200 | Withdrawn |
| Another phase high confidence | MOUNT SIGNAL SOLAR FARM II | Solar | 200 | Withdrawn |
| Another phase medium confidence | MOUNT SIGNAL SOLAR FARM | Solar | 200 | Withdrawn |
Also at this interconnection point (43)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- SILVER RIDGE MOUNT SIGNAL Solar + storage, 600 MW, contracted at Imperial Valley Substation 230 kV
- SUNRISE BUTTE Solar + storage, 150 MW, contracted at Imperial Valley Substation 230 kV
- LECONTE ENERGY STORAGE Storage, 125 MW, contracted at Imperial Valley Substation 230 kV
- BATERIA DEL SUR Storage, 350 MW, built at Imperial Valley Substation 230 kV
- BIG ROCK SOLAR FARM Storage, 200 MW, built at Imperial Valley Substation 230 kV
- IMPERIAL VALLEY WEST Solar, 150 MW, built at Imperial Valley Substation 230 kV
- CAMPO VERDE SOLAR (FKA USS WIXOM SOLAR 1) Solar, 147 MW, built at Imperial Valley Substation 230 kV
- IV SUBSTATION SOUTH Solar, 130 MW, built at Imperial Valley Substation 230 kV
- CENTINELA SOLAR ENERGY Solar, 125 MW, built at Imperial Valley Substation 230 kV
- WISTARIA RANCH SOLAR ENERGY Solar, 100 MW, built at Imperial Valley Substation 230 kV
- BLUE HORNET SOLAR Solar, 100 MW, built at Imperial Valley Substation 230 kV
- CENTINELA SOLAR ENERGY EXPANSION (45 MW) Solar, 45 MW, built at Imperial Valley Substation 230 kV
- BAJANORTE WIND FACILITY Wind, 1,000 MW, withdrawn at Imperial Valley Substation 230 kV
- IMPERIAL VALLEY GENERATION PROJECT Gas, combustion turbine, 600 MW, withdrawn at Imperial Valley Substation 230 kV
- YUHA DESERT BATTERY STORAGE Storage, 600 MW, withdrawn at Imperial Valley Substation 230 kV
- SOLAR FOUR Solar, 510 MW, withdrawn at Imperial Valley Substation 230 kV
- MEXICO WIND Wind, 500 MW, withdrawn at Imperial Valley Substation 230 kV
- RE AUSTIN Solar, 500 MW, withdrawn at Imperial Valley Substation 230 kV
- VOLTA DE MEXICALI Storage, 500 MW, withdrawn at Imperial Valley Substation 230 kV
- WESTSIDE CANAL ENERGY CENTER Solar + storage, 425 MW, withdrawn at Imperial Valley Substation 230 kV
- HICKORY SOLAR FARM Solar, 400 MW, withdrawn at Imperial Valley Substation 230 kV
- SALTON SOLAR Solar + storage, 400 MW, withdrawn at Imperial Valley Substation 230 kV
- BIG HORN ENERGY STORAGE Storage, 400 MW, withdrawn at Imperial Valley Substation 230 kV
- DREW ROAD GENERATION Gas, combustion turbine, 344 MW, withdrawn at Imperial Valley Substation 230 kV
- SES SOLAR TWO) Solar, 300 MW, withdrawn at Imperial Valley Substation 230 kV
- AUBANEL I WIND PROJECT Wind, 300 MW, withdrawn at Imperial Valley Substation 230 kV
- Kingsley Solar Farm Solar + storage, 299 MW, withdrawn at Imperial Valley Substation 230 kV
- IMPERIAL SOLAR 1 Solar (thermal), 280 MW, withdrawn at Imperial Valley Substation 230 kV
- SOLAR DE MEXICALI Solar + storage, 275 MW, withdrawn at Imperial Valley Substation 230 kV
- SILVER LEAF SOLAR Solar, 250 MW, withdrawn at Imperial Valley Substation 230 kV
- IMPERIAL SOLEIL Solar (thermal), 211.6 MW, withdrawn at Imperial Valley Substation 230 kV
- LAGUNA SALADA PV POWER PLANT Solar, 200.6 MW, withdrawn at Imperial Valley Substation 230 kV
- CARDINAL STORAGE Storage, 200 MW, withdrawn at Imperial Valley Substation 230 kV
- ACORN GREENWORKS Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- SILVERTREE GREENWORKS Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- RANCHO WISTARIA SOLAR ENERGY CENTER Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- WISTARIA SOLAR 2 Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- SONORA SOLAR GENERATING STATION Solar (thermal), 84 MW, withdrawn at Imperial Valley Substation 230 kV
- YUHA BASIN SOLAR Solar, 75 MW, withdrawn at Imperial Valley Substation 230 kV
- SILVERLEAF SOLAR II Solar, 60 MW, withdrawn at Imperial Valley Substation 230 kV
- CENTINELA SOLAR ENERGY EXPANSION II - 45 MW EXPANSION Solar, 45 MW, withdrawn at Imperial Valley Substation 230 kV
- BCS ENERGY STORAGE Solar + storage, 20 MW, withdrawn at Imperial Valley Substation 230 kV
- CENTINELA SOLAR ENERGY FACILITY 2MWFT Storage, 2 MW, withdrawn at Imperial Valley Substation 230 kV
Timeline
- Observed as withdrawn in CAISO.
- Stated In-service date stated by CAISO.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO