Centinela Solar Energy
Solar
As filed: CENTINELA SOLAR ENERGY
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Location
- IMPERIAL County, California (exact site not public)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Connects at
- Imperial Valley Substation 230 kVConnection point875 MW active (3 of 46 projects).
At this site
4 records at CENTINELA SOLAR ENERGYAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | CENTINELA SOLAR ENERGY this record | Solar | 125 | Built |
| Another phase medium confidence | CENTINELA SOLAR ENERGY EXPANSION (45 MW) | Solar | 45 | Built |
| Another phase medium confidence | CENTINELA SOLAR ENERGY EXPANSION II - 45 MW EXPANSION | Solar | 45 | Withdrawn |
| Co-located, other technology high confidence | CENTINELA SOLAR ENERGY FACILITY 2MWFT | Storage | 2 | Withdrawn |
Also at this interconnection point (42)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- SILVER RIDGE MOUNT SIGNAL Solar + storage, 600 MW, contracted at Imperial Valley Substation 230 kV
- SUNRISE BUTTE Solar + storage, 150 MW, contracted at Imperial Valley Substation 230 kV
- LECONTE ENERGY STORAGE Storage, 125 MW, contracted at Imperial Valley Substation 230 kV
- BATERIA DEL SUR Storage, 350 MW, built at Imperial Valley Substation 230 kV
- BIG ROCK SOLAR FARM Storage, 200 MW, built at Imperial Valley Substation 230 kV
- IMPERIAL VALLEY WEST Solar, 150 MW, built at Imperial Valley Substation 230 kV
- CAMPO VERDE SOLAR (FKA USS WIXOM SOLAR 1) Solar, 147 MW, built at Imperial Valley Substation 230 kV
- IV SUBSTATION SOUTH Solar, 130 MW, built at Imperial Valley Substation 230 kV
- WISTARIA RANCH SOLAR ENERGY Solar, 100 MW, built at Imperial Valley Substation 230 kV
- BLUE HORNET SOLAR Solar, 100 MW, built at Imperial Valley Substation 230 kV
- BAJANORTE WIND FACILITY Wind, 1,000 MW, withdrawn at Imperial Valley Substation 230 kV
- IMPERIAL VALLEY GENERATION PROJECT Gas, combustion turbine, 600 MW, withdrawn at Imperial Valley Substation 230 kV
- YUHA DESERT BATTERY STORAGE Storage, 600 MW, withdrawn at Imperial Valley Substation 230 kV
- SOLAR FOUR Solar, 510 MW, withdrawn at Imperial Valley Substation 230 kV
- MEXICO WIND Wind, 500 MW, withdrawn at Imperial Valley Substation 230 kV
- RE AUSTIN Solar, 500 MW, withdrawn at Imperial Valley Substation 230 kV
- VOLTA DE MEXICALI Storage, 500 MW, withdrawn at Imperial Valley Substation 230 kV
- WESTSIDE CANAL ENERGY CENTER Solar + storage, 425 MW, withdrawn at Imperial Valley Substation 230 kV
- HICKORY SOLAR FARM Solar, 400 MW, withdrawn at Imperial Valley Substation 230 kV
- SALTON SOLAR Solar + storage, 400 MW, withdrawn at Imperial Valley Substation 230 kV
- BIG HORN ENERGY STORAGE Storage, 400 MW, withdrawn at Imperial Valley Substation 230 kV
- DREW ROAD GENERATION Gas, combustion turbine, 344 MW, withdrawn at Imperial Valley Substation 230 kV
- SES SOLAR TWO) Solar, 300 MW, withdrawn at Imperial Valley Substation 230 kV
- AUBANEL I WIND PROJECT Wind, 300 MW, withdrawn at Imperial Valley Substation 230 kV
- Kingsley Solar Farm Solar + storage, 299 MW, withdrawn at Imperial Valley Substation 230 kV
- IMPERIAL SOLAR 1 Solar thermal, 280 MW, withdrawn at Imperial Valley Substation 230 kV
- SOLAR DE MEXICALI Solar + storage, 275 MW, withdrawn at Imperial Valley Substation 230 kV
- SILVER LEAF SOLAR Solar, 250 MW, withdrawn at Imperial Valley Substation 230 kV
- IMPERIAL SOLEIL Solar thermal, 211.6 MW, withdrawn at Imperial Valley Substation 230 kV
- LAGUNA SALADA PV POWER PLANT Solar, 200.6 MW, withdrawn at Imperial Valley Substation 230 kV
- MOUNT SIGNAL SOLAR FARM Solar, 200 MW, withdrawn at Imperial Valley Substation 230 kV
- MOUNT SIGNAL SOLAR FARM II Solar, 200 MW, withdrawn at Imperial Valley Substation 230 kV
- MOUNT SIGNAL SOLAR FARM III Solar, 200 MW, withdrawn at Imperial Valley Substation 230 kV
- CARDINAL STORAGE Storage, 200 MW, withdrawn at Imperial Valley Substation 230 kV
- ACORN GREENWORKS Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- SILVERTREE GREENWORKS Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- RANCHO WISTARIA SOLAR ENERGY CENTER Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- WISTARIA SOLAR 2 Solar, 150 MW, withdrawn at Imperial Valley Substation 230 kV
- SONORA SOLAR GENERATING STATION Solar thermal, 84 MW, withdrawn at Imperial Valley Substation 230 kV
- YUHA BASIN SOLAR Solar, 75 MW, withdrawn at Imperial Valley Substation 230 kV
- SILVERLEAF SOLAR II Solar, 60 MW, withdrawn at Imperial Valley Substation 230 kV
- BCS ENERGY STORAGE Solar + storage, 20 MW, withdrawn at Imperial Valley Substation 230 kV
Timeline
- Observed as built in CAISO.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources CAISO