Show on map
- Wind & solar
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Under construction
Murphysboro 2: the source's site coordinate and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Murphysboro 2
Solar
Key facts
Solar Permitted (source status: (T) Regulatory approvals received. Not under construction) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Jackson County, Illinois
Details
Who’s behind it
- Developer
- Navisun LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 69860 generator MURP2
At this site
2 records at Murphysboro 1At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Murphysboro 1 | Solar | 5 | Permitted |
| Another phase high confidence | Murphysboro 2 this record | Solar | 1.3 | Permitted |
Sources EIA-860M
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as permitted in EIA-860M (source status: “(T) Regulatory approvals received. Not under construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Murphysboro 1 Permitted | Solar | 0.0 mi | 5 |
| Big Muddy Solar Under construction | Solar | 5.3 mi | 95 |
Sources EIA-860M