Mynydd Y Gwynt

Wind + storage

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-006086
In-service date
(stated)
Location
MID WALES CONNECTION NODE A 400KV SUBSTATION, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind + storage source: “Energy Storage System;Wind Onshore”
Connects at
MID WALES CONNECTION NODE A 400KV SUBSTATIONConnection point799 MW active (4 of 4 projects).

At this site

2 records at Garn Fach Wind FarmAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Garn Fach Wind Farm Wind + storage 162 Filed
Same site, relation unclear low confidence Mynydd Y Gwynt this record Wind + storage 100 Filed
Also at this interconnection point (2)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • Galileo 09 Solar + storage, 297 MW, filed at MID WALES CONNECTION NODE A 400KV SUBSTATION
  • Lightsource Berthlwyd Solar + storage, 240 MW, filed at MID WALES CONNECTION NODE A 400KV SUBSTATION

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 18, 2026Supported by National Energy SO Open Data
  • GEMTerms of use · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 18, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem