Mynydd Y Gwynt
Wind + storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-006086
- In-service date
- (stated)
- Location
- MID WALES CONNECTION NODE A 400KV SUBSTATION, United Kingdom
Details
Who’s behind it
- Developer
- EDF Energy Renewables Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Wind + storage source: “Energy Storage System;Wind Onshore”
- Connects at
- MID WALES CONNECTION NODE A 400KV SUBSTATIONConnection point799 MW active (4 of 4 projects).
At this site
2 records at Garn Fach Wind FarmAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Garn Fach Wind Farm | Wind + storage | 162 | Filed |
| Same site, relation unclear low confidence | Mynydd Y Gwynt this record | Wind + storage | 100 | Filed |
Also at this interconnection point (2)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Galileo 09 Solar + storage, 297 MW, filed at MID WALES CONNECTION NODE A 400KV SUBSTATION
- Lightsource Berthlwyd Solar + storage, 240 MW, filed at MID WALES CONNECTION NODE A 400KV SUBSTATION
Supported by National Energy SO Open Data
Sources
- NESOSupported by National Energy SO Open Data
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Stated In-service date stated by NESO.
- Observed as filed in NESO (source status: “Scoping”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data