Nightfall Solar
Solar
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 21INR0334
- In-service date
- (stated)
- Location
- Uvalde County, Texas
Details
Who’s behind it
- Developer
- Sol Systems
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Capacity (MW)
- 180.9 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 180 MW nameplate.
- Connects at
- 138 kV Tap 8707 Dryfrio - 8234 Uvalde (new 138 kV Meil station)Connection point0 MW active (0 of 1 projects).
- EIA plant
- 69245 generator NTFL
Timeline
- Stated In-service date stated by ERCOT.
- Observed as built in ERCOT (source status: “Completed”).
- ERCOT GIS Report (Generator Interconnection Status): status under construction → built.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Alamo 5 BESS 1 Postponed | Storage | 4.4 km | 100 |
| Uvalde 2 BESS 2 Postponed | Storage | 4.5 km | 150 |
| Uvalde Solar 2 Announced | Solar | 4.5 km | 300 |
| Uvalde 2 BESS 1 Postponed | Storage | 4.5 km | 75 |
| Uvalde Solar 1 Postponed | Solar | 4.5 km | 150 |
| Alamo 5 BESS 2 Postponed | Storage | 4.8 km | 100 |