Ninfield
Solar + storage
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-003408
- In-service date
- (stated)
- Location
- Sussex and Romney Connection Node A 400kV Substation, United Kingdom
Details
Who’s behind it
- Developer
- Ninfield 10 Renewables Limited
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
- Connects at
- Sussex and Romney Connection Node A 400kV SubstationConnection point4,041.7 MW active (11 of 11 projects).
At this site
3 records at NinfieldAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Ninfield this record | Solar + storage | 1,000 | Filed |
| Same site, relation unclear low confidence | Ninfield BESS | Storage | 225 | Filed |
| Same site, relation unclear low confidence | TH Ninfield | Storage | 200 | Filed |
Also at this interconnection point (8)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Little Horsted Energy Park Solar + storage, 1,260 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- STABLE GREEN ENERGY Storage, 500 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- Zenobe Little Horsted BESS Storage, 300 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- New Little Horsted 200MW Solar and BESS Solar + storage, 200 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- KXP Alpha 1 Little Horsted Storage, 99.9 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- KXP Alpha 2 Little Horsted Storage, 99.9 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- KXP Alpha 3 Little Horsted Storage, 99.9 MW, filed at Sussex and Romney Connection Node A 400kV Substation
- Little Horsted Solar + storage, 57 MW, filed at Sussex and Romney Connection Node A 400kV Substation
Sources NESO
Supported by National Energy SO Open Data
Timeline
- Stated In-service date stated by NESO.
- Observed as filed in NESO (source status: “Scoping”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources NESO
Supported by National Energy SO Open Data