OCI Cobb Creek ESS in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
OCI Cobb Creek ESS
Storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 25INR0233
- In-service date
- (stated)
- Location
- Hill County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Hillsboro Solar Project LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Other - Battery Energy Storage”
- Connects at
- tap 345kV 1907 Venus - 68090 Sam SwConnection point404.7 MW active (2 of 3 projects).
At this site
2 records at OCI Cobb Creek SolarAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | OCI Cobb Creek Solar | Solar | 203.1 | Contracted |
| Co-located, other technology high confidence | OCI Cobb Creek ESS this record | Storage | 201.6 | Contracted |
Also at this interconnection point (1)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Compadre Solar Solar, 405.7 MW, built at tap 345kV 1907 Venus - 68090 Sam Sw
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.