Show on map
Pecan Creek Energy CenterHolstein 2 Battery Storage — Announced · Storage · TX · 100 MW · 13.5 mi awayHayrick BESS — Studied · Storage · TX · 113.9 MW · 13.6 mi away
  • Storage
  • In development
  • 10 · 100 · 1,000 MW

Pecan Creek Energy Center

Gas, combustion turbine

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Nolan County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Capacity (MW)
343.6 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
59298 2 generatorsEIA generatorsPlant 59298 PCEC1, PCEC2

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Holstein 2 Battery Storage Announced Storage 13.5 mi 100
Hayrick BESS Studied Storage 13.6 mi 113.9

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution