Show on map
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Pecan Prairie South Solar: the source's site coordinate and 9 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Pecan Prairie South Solar
Solar
Key facts
Solar Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 21INR0371
- In-service date
- (stated)
- Location
- Leon County, Texas
Details
Who’s behind it
- Developer
- Repsol Renewables NA
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Capacity (MW)
- 133 Capacity is the interconnection request in ERCOT GIS Report (Generator Interconnection Status). The 1 generator listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 132.9 MW nameplate.
- Connects at
- CTT Yellow Wolf, bus # 79007Connection point457.1 MW active (2 of 2 projects).
- EIA plant
- 64981 generator CPSS1
At this site
2 records at Pecan Prairie North SolarAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Pecan Prairie North Solar | Solar | 324.1 | Under construction |
| Same site, relation unclear low confidence | Pecan Prairie South Solar this record | Solar | 133 | Under construction |
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Pecan BESS Studied | Storage | 2.0 mi | 157.1 |
| Coati Solar, LLC Postponed | Solar + storage | 6.4 mi | 425 |
| Pecan Prairie North Solar Under construction | Solar | 6.7 mi | 324.1 |
| Hollow Branch Creek Filed | Solar | 9.8 mi | 460 |
| Hollow Branch Creek Postponed | Storage | 9.8 mi | 460 |
| Holly Branch Solar, LLC Postponed | Solar + storage | 11.8 mi | 330 |
| SOSA Energy Center Under construction | Storage | 12.2 mi | 154.6 |
| Tex-Bar ESS Contracted | Storage | 14.0 mi | 201.5 |
| Hollow Branch Creek 1 Solar Postponed | Solar | 14.6 mi | 460 |