Show on map
Hollow Branch CreekHollow Branch Creek — Filed · Solar · TX · 460 MW · 0.0 mi awayHollow Branch Creek 1 Solar — Postponed · Solar · TX · 460 MW · 4.9 mi awayTex-Bar ESS — Contracted · Storage · TX · 201.5 MW · 9.2 mi awaySOSA Energy Center — Under construction · Storage · TX · 154.6 MW · 9.3 mi awayPecan Prairie South Solar — Under construction · Solar · TX · 133 MW · 9.8 mi awayPecan BESS — Studied · Storage · TX · 157.1 MW · 10.0 mi awayPecan Prairie North Solar — Under construction · Solar · TX · 324.1 MW · 13.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Hollow Branch Creek

Storage

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Madison County, Texas

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Batteries”
EIA plant
65851 generator HB2BS

At this site

2 records at Hollow Branch CreekAt this siteGrouped by the same EIA plant id. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Hollow Branch Creek Solar 460 Filed
Unit of EIA plant 65851 high confidence Hollow Branch Creek this record Storage 460 Postponed

Sources EIA-860M

Sources

  • EIA-860MTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Hollow Branch Creek Filed Solar 0.0 mi 460
Hollow Branch Creek 1 Solar Postponed Solar 4.9 mi 460
Tex-Bar ESS Contracted Storage 9.2 mi 201.5
SOSA Energy Center Under construction Storage 9.3 mi 154.6
Pecan Prairie South Solar Under construction Solar 9.8 mi 133
Pecan BESS Studied Storage 10.0 mi 157.1
Pecan Prairie North Solar Under construction Solar 13.6 mi 324.1

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution