Exact site not public
Map
Pecos Flats Solar II in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Pecos Flats Solar II
Solar
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 29INR0182
- In-service date
- (stated)
- Location
- Pecos County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Glass Mountain Solar, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Connects at
- Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5Connection point1,633.7 MW active (4 of 4 projects).
At this site
2 records at Pecos Flats Solar IIAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Pecos Flats Solar II this record | Solar | 301.5 | Studied |
| Another phase high confidence | Pecos Flats Solar III | Solar | 301.5 | Studied |
Also at this interconnection point (2)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- Glass Mountain Wind 2 Wind, 519.2 MW, studied at Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5
- Glass Mountain Wind 1 Wind, 511.5 MW, studied at Tap 345 kV 60404 SOLSTICE - 11098 SANDLAKE_5
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as studied in ERCOT (source status: “Active”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT