Show on map
Peristeri Pyrgos wind farm --Peristeri Kaloyeros wind farm -- — Canceled · Wind · 15.6 MW · 1.3 km awayPeristeri Alatista wind farm -- — Canceled · Wind · 15 MW · 5.0 km awayThanasaki (Pindos) wind farm -- — Canceled · Wind · 30 MW · 11.7 km awayThanasake - Voulyare wind farm -- — Canceled · Wind · 37.8 MW · 12.0 km awayKyra Variko wind farm -- — Canceled · Wind · 37.8 MW · 12.0 km awayMakrovouni Dokimi Kopanes wind farm -- — Canceled · Wind · 85 MW · 12.4 km awayKyra wind farm -- — Canceled · Wind · 25 MW · 13.5 km awayKedros (Green Velocity) wind farm -- — Announced · Wind · 21.6 MW · 16.3 km awaySdiryiani wind farm -- — Announced · Wind · 30 MW · 17.6 km awayXerovouni Variko Kladero wind farm -- — Canceled · Wind · 44.8 MW · 18.4 km awayKenegos wind farm -- — Announced · Wind · 25.2 MW · 20.4 km awayTsonariko Moutsoria (Pindos) wind farm -- — Announced · Wind · 50 MW · 24.1 km awayTsonariko Moutsoria wind farm -- — Canceled · Wind · 46 MW · 24.1 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Peristeri Pyrgos wind farm --

Wind

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Epirus and Western Macedonia, Greece

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Wind source: “wind / Onshore”

Timeline

  • Observed as canceled in GEM (source status: “cancelled”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Peristeri Kaloyeros wind farm -- Canceled Wind 1.3 km 15.6
Peristeri Alatista wind farm -- Canceled Wind 5.0 km 15
Thanasaki (Pindos) wind farm -- Canceled Wind 11.7 km 30
Thanasake - Voulyare wind farm -- Canceled Wind 12.0 km 37.8
Kyra Variko wind farm -- Canceled Wind 12.0 km 37.8
Makrovouni Dokimi Kopanes wind farm -- Canceled Wind 12.4 km 85
Kyra wind farm -- Canceled Wind 13.5 km 25
Kedros (Green Velocity) wind farm -- Announced Wind 16.3 km 21.6
Sdiryiani wind farm -- Announced Wind 17.6 km 30
Xerovouni Variko Kladero wind farm -- Canceled Wind 18.4 km 44.8
Kenegos wind farm -- Announced Wind 20.4 km 25.2
Tsonariko Moutsoria (Pindos) wind farm -- Announced Wind 24.1 km 50
Tsonariko Moutsoria wind farm -- Canceled Wind 24.1 km 46

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution