Show on map
- Combustion
- Clean firm
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Combustion
- Clean firm
- Wind & solar
- In development
Phước Ninh solar farm 3: the source's site coordinate and 8 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Phước Ninh solar farm 3
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Ninh Thuận, Vietnam
Details
Who’s behind it
- Developer
- Ninh Thuan Energy Industry JSC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / Assumed PV”
At this site
2 records at Phước Ninh solar farm 2At this siteGrouped by the same exact location and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Phước Ninh solar farm 2 | Solar | 50 | Announced |
| Another phase high confidence | Phước Ninh solar farm 3 this record | Solar | 38 | Announced |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Timeline
- Observed as announced in GEM (source status: “announced”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Phước Ninh solar farm 2 Announced | Solar | 0.0 km | 50 |
| Ninh Thuận 1 nuclear power plant 1 Announced | Nuclear | 10.1 km | 1,200 |
| Ninh Thuận 1 nuclear power plant 2 Announced | Nuclear | 10.1 km | 1,200 |
| Ninh Thuận 1 nuclear power plant 3 Announced | Nuclear | 10.1 km | 1,200 |
| Ninh Thuận 1 nuclear power plant 4 Announced | Nuclear | 10.1 km | 1,200 |
| Vinh Tan power station Phase 3 Unit 1 Announced | Coal | 17.5 km | 660 |
| Vinh Tan power station Phase 3 Unit 2 Announced | Coal | 17.5 km | 660 |
| Vinh Tan power station Phase 3 Unit 3 Announced | Coal | 17.5 km | 660 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.