Show on map
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Pinecone: the source's site coordinate and 1 exact-grade project within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Pinecone
Solar
Key facts
Solar Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- Florida Power & Light (FPL)
- In-service date
- (stated)
- Location
- Calhoun County, Florida
Details
Who’s behind it
- Developer
- Florida Power & Light Co · part of NextEra EnergyOwnership claimOwnership link recorded from the companies' own published statements; no date stated by the source.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 68825 generator 1
At this site
2 records at PineconeAt this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Pinecone this record | Solar | 74.5 | Under construction |
| Same site, relation unclear low confidence | Saddle | Solar | 74.5 | Under construction |
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Saddle Under construction | Solar | 0.0 km | 74.5 |