Show on map
Pistachio Road 1726-WDChalan — Under construction · Solar + storage · CA · 64.9 MW · 5.1 mi awayGardenia 1 — Announced · Solar + storage · CA · 6 MW · 5.8 mi awayPelicans Jaw Hybrid Solar — Under construction · Solar + storage · CA · 678.5 MW · 9.2 mi awayChevron - Lost Hills Hybrid — Postponed · Storage · CA · 10 MW · 12.8 mi away
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Pistachio Road 1726-WD

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
In-service date
(stated)
Location
Kern County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
67749 generator TWISS

Timeline

  • Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
  • EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-09-01 → 2026-10-01.
  • Stated In-service date stated by EIA-860M.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Chalan Under construction Solar + storage 5.1 mi 64.9
Gardenia 1 Announced Solar + storage 5.8 mi 6
Pelicans Jaw Hybrid Solar Under construction Solar + storage 9.2 mi 678.5
Chevron - Lost Hills Hybrid Postponed Storage 12.8 mi 10

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution