Show on map
- Wind & solar
- In development
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
Povoação solar farm 2: the source's site coordinate and 72 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Povoação solar farm 2
Solar
- Capacity
- Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
- Location
- Minas Gerais, Brazil
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “utility-scale solar / PV”
Timeline
- Observed as announced in GEM (source status: “pre-construction”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
Around this project
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Povoação solar farm 5 Announced | Solar | 0.6 km | 48 |
| Povoação solar farm 1 Announced | Solar | 0.7 km | 42 |
| Povoação solar farm 3 Announced | Solar | 0.8 km | 48 |
| Povoação solar farm 4 Announced | Solar | 1.1 km | 48 |
| Povoação solar farm 6 Announced | Solar | 1.6 km | 48 |
| Povoação solar farm 7 Announced | Solar | 1.9 km | 48 |
| Povoação solar farm 8 Announced | Solar | 2.3 km | 48 |
| Povoação solar farm 10 Announced | Solar | 2.8 km | 30 |
| Povoação solar farm 9 Announced | Solar | 3.4 km | 48 |
| Povoação solar farm 11 Announced | Solar | 3.6 km | 30 |
| São Miguel (Minas Gerais) solar farm 8 Canceled | Solar | 15.1 km | 50 |
| São Miguel (Minas Gerais) solar farm 12 Canceled | Solar | 15.5 km | 50 |
| São Miguel (Minas Gerais) solar farm 14 Canceled | Solar | 15.8 km | 50 |
| São Miguel (Minas Gerais) solar farm 9 Canceled | Solar | 15.9 km | 50 |
| São Miguel (Minas Gerais) solar farm 11 Canceled | Solar | 16.0 km | 50 |
| São Miguel (Minas Gerais) solar farm 10 Canceled | Solar | 16.1 km | 50 |
| São Miguel (Minas Gerais) solar farm 13 Canceled | Solar | 16.3 km | 50 |
| São Miguel (Minas Gerais) solar farm 3 Canceled | Solar | 16.5 km | 50 |
| São Miguel (Minas Gerais) solar farm 4 Canceled | Solar | 16.7 km | 50 |
| São Miguel (Minas Gerais) solar farm 6 Canceled | Solar | 16.7 km | 50 |
| São Miguel (Minas Gerais) solar farm 7 Canceled | Solar | 16.8 km | 50 |
| GS Buritizeiro solar farm 1 Announced | Solar | 17.0 km | 30 |
| São Miguel (Minas Gerais) solar farm 15 Canceled | Solar | 17.0 km | 50 |
| GS Buritizeiro solar farm 3 Announced | Solar | 17.2 km | 30 |
| São Miguel (Minas Gerais) solar farm 5 Canceled | Solar | 17.5 km | 50 |
| São Miguel (Minas Gerais) solar farm 2 Canceled | Solar | 17.7 km | 50 |
| São Miguel (Minas Gerais) solar farm 1 Canceled | Solar | 18.1 km | 50 |
| GS Buritizeiro solar farm 2 Announced | Solar | 18.3 km | 30 |
| Guará solar farm 4 Announced | Solar | 18.5 km | 30 |
| Guará solar farm 3 Announced | Solar | 18.7 km | 30 |
| Guará solar farm 2 Announced | Solar | 19.1 km | 30 |
| Guará solar farm 1 Announced | Solar | 19.5 km | 30 |
| Leo Silveira solar farm 22 Announced | Solar | 20.2 km | 50 |
| Andorinhas solar farm 7 Announced | Solar | 20.9 km | 50 |
| Leo Silveira solar farm 23 Announced | Solar | 21.1 km | 50 |
| Minas do Sol solar farm 2 Announced | Solar | 21.2 km | 25 |
| Minas do Sol solar farm 4 Announced | Solar | 21.4 km | 25 |
| Andorinhas solar farm 6 Announced | Solar | 21.4 km | 50 |
| Minas do Sol solar farm 1 Announced | Solar | 21.4 km | 25 |
| Minas do Sol solar farm 5 Announced | Solar | 21.4 km | 25 |
| Minas do Sol solar farm 3 Announced | Solar | 21.4 km | 25 |
| Leo Silveira solar farm 21 Announced | Solar | 21.8 km | 50 |
| Minas do Sol solar farm 6 Announced | Solar | 21.9 km | 25 |
| Pirapora (Rubi) solar farm 1 Canceled | Solar | 21.9 km | 44.4 |
| Leo Silveira solar farm 24 Announced | Solar | 21.9 km | 50 |
| Andorinhas solar farm 10 Announced | Solar | 22.3 km | 50 |
| Minas do Sol solar farm 7 Announced | Solar | 22.3 km | 25 |
| Andorinhas solar farm 4 Announced | Solar | 22.4 km | 50 |
| Andorinhas solar farm 5 Announced | Solar | 22.4 km | 50 |
| Andorinhas solar farm 9 Announced | Solar | 22.5 km | 50 |
| Andorinhas solar farm 8 Announced | Solar | 22.5 km | 50 |
| Leo Silveira solar farm 25 Announced | Solar | 22.6 km | 50 |
| Andorinhas solar farm 2 Announced | Solar | 22.6 km | 50 |
| Pirapora (Rubi) solar farm 2 Canceled | Solar | 22.8 km | 44.4 |
| Leo Silveira solar farm 26 Announced | Solar | 22.8 km | 50 |
| Andorinhas solar farm 3 Announced | Solar | 22.9 km | 50 |
| Minas do Sol solar farm 8 Announced | Solar | 23.0 km | 25 |
| Pirapora (Rubi) solar farm 3 Canceled | Solar | 23.3 km | 44.4 |
| Andorinhas solar farm 11 Announced | Solar | 23.4 km | 40.2 |
| Andorinhas solar farm 1 Announced | Solar | 23.5 km | 50 |
| Pirapora (Rubi) solar farm 4 Canceled | Solar | 23.6 km | 44.4 |
| Leo Silveira solar farm 27 Announced | Solar | 23.7 km | 50 |
| Pirapora (Rubi) solar farm 5 Canceled | Solar | 24.0 km | 44.4 |
| Leo Silveira solar farm 29 Announced | Solar | 24.1 km | 50 |
| Leo Silveira solar farm 30 Announced | Solar | 24.1 km | 50 |
| Leo Silveira solar farm 28 Announced | Solar | 24.3 km | 50 |
| Leo Silveira solar farm 35 Announced | Solar | 24.3 km | 50 |
| Pirapora (Rubi) solar farm 6 Canceled | Solar | 24.4 km | 37 |
| Pirapora (Rubi) solar farm 7 Canceled | Solar | 24.5 km | 37 |
| Leo Silveira solar farm 36 Announced | Solar | 24.6 km | 50 |
| Leo Silveira solar farm 37 Announced | Solar | 24.6 km | 50 |
| Leo Silveira solar farm 31 Announced | Solar | 24.8 km | 50 |
Sources GEM
Sources
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.