Show on map
Pre Cedro solar farm 11Pre Cedro solar farm 12 — Announced · Solar · 30.9 MW · 0.5 km awayPre Cedro solar farm 10 — Announced · Solar · 30.9 MW · 0.6 km awayPre Cedro solar farm 13 — Announced · Solar · 30.9 MW · 1.0 km awayPre Cedro solar farm 14 — Announced · Solar · 20.6 MW · 1.7 km awayPre Cedro solar farm 6 — Announced · Solar · 30.9 MW · 6.2 km awayPre Cedro solar farm 5 — Announced · Solar · 30.9 MW · 6.6 km awayPre Cedro solar farm 7 — Announced · Solar · 30.9 MW · 6.9 km awayPre Cedro solar farm 4 — Announced · Solar · 30.9 MW · 7.1 km awayPre Cedro solar farm 8 — Announced · Solar · 30.9 MW · 7.4 km awayPre Cedro solar farm 9 — Announced · Solar · 30.9 MW · 8.1 km awayPre Cedro solar farm 2 — Announced · Solar · 30.9 MW · 8.9 km awayPre Cedro solar farm 1 — Announced · Solar · 30.9 MW · 9.4 km awayPre Cedro solar farm 3 — Announced · Solar · 17.2 MW · 9.7 km awayGado Bravo solar farm 1 — Announced · Solar · 50 MW · 18.0 km awayGado Bravo solar farm 2 — Announced · Solar · 50 MW · 19.5 km awaySolaris (Pacto) solar farm 132 — Announced · Solar · 50 MW · 20.0 km awaySolaris (Pacto) solar farm 130 — Announced · Solar · 50 MW · 20.1 km awaySolaris (Pacto) solar farm 133 — Announced · Solar · 40.6 MW · 20.1 km awaySolaris (Pacto) solar farm 131 — Announced · Solar · 31.2 MW · 20.5 km awayGado Bravo solar farm 3 — Announced · Solar · 50 MW · 20.6 km awaySolaris (Pacto) solar farm 129 — Announced · Solar · 50 MW · 20.9 km awayGado Bravo solar farm 5 — Announced · Solar · 50 MW · 21.0 km awayGado Bravo solar farm 4 — Announced · Solar · 50 MW · 21.5 km awayLagoa Grande solar farm 7 — Announced · Solar · 55.7 MW · 22.1 km awayLagoa Grande solar farm 12 — Announced · Solar · 55.7 MW · 22.2 km awaySol de Jana solar farm 3 — Announced · Solar · 38.8 MW · 22.3 km awayGado Bravo solar farm 6 — Announced · Solar · 37.5 MW · 22.4 km awayLagoa Grande solar farm 11 — Announced · Solar · 55.7 MW · 22.8 km awaySol de Jana solar farm 2 — Announced · Solar · 38.8 MW · 22.9 km awayLagoa Grande solar farm 8 — Announced · Solar · 55.7 MW · 23.1 km awayGado Bravo solar farm 7 — Announced · Solar · 37.5 MW · 23.3 km awaySol de Jana solar farm 1 — Announced · Solar · 38.8 MW · 23.4 km awayLagoa Grande solar farm 6 — Announced · Solar · 55.7 MW · 23.4 km awaySol de Jana solar farm 5 — Announced · Solar · 38.8 MW · 23.7 km awaySol de Jana solar farm 4 — Announced · Solar · 38.8 MW · 23.9 km awayLagoa Grande solar farm 5 — Announced · Solar · 55.7 MW · 23.9 km awayGado Bravo solar farm 8 — Announced · Solar · 37.5 MW · 24.2 km awayLagoa Grande solar farm 13 — Announced · Solar · 55.7 MW · 24.2 km awayLagoa Grande solar farm 10 — Announced · Solar · 60.6 MW · 24.2 km awaySol de Jana solar farm 6 — Announced · Solar · 38.8 MW · 24.3 km awayLagoa Grande solar farm 3 — Announced · Solar · 55.7 MW · 24.5 km awayLagoa Grande solar farm 1 — Announced · Solar · 55.7 MW · 24.5 km awayLagoa Grande solar farm 14 — Announced · Solar · 55.7 MW · 24.8 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Pre Cedro solar farm 11

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Minas Gerais, Brazil

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Pre Cedro solar farm 12 Announced Solar 0.5 km 30.9
Pre Cedro solar farm 10 Announced Solar 0.6 km 30.9
Pre Cedro solar farm 13 Announced Solar 1.0 km 30.9
Pre Cedro solar farm 14 Announced Solar 1.7 km 20.6
Pre Cedro solar farm 6 Announced Solar 6.2 km 30.9
Pre Cedro solar farm 5 Announced Solar 6.6 km 30.9
Pre Cedro solar farm 7 Announced Solar 6.9 km 30.9
Pre Cedro solar farm 4 Announced Solar 7.1 km 30.9
Pre Cedro solar farm 8 Announced Solar 7.4 km 30.9
Pre Cedro solar farm 9 Announced Solar 8.1 km 30.9
Pre Cedro solar farm 2 Announced Solar 8.9 km 30.9
Pre Cedro solar farm 1 Announced Solar 9.4 km 30.9
Pre Cedro solar farm 3 Announced Solar 9.7 km 17.2
Gado Bravo solar farm 1 Announced Solar 18.0 km 50
Gado Bravo solar farm 2 Announced Solar 19.5 km 50
Solaris (Pacto) solar farm 132 Announced Solar 20.0 km 50
Solaris (Pacto) solar farm 130 Announced Solar 20.1 km 50
Solaris (Pacto) solar farm 133 Announced Solar 20.1 km 40.6
Solaris (Pacto) solar farm 131 Announced Solar 20.5 km 31.2
Gado Bravo solar farm 3 Announced Solar 20.6 km 50
Solaris (Pacto) solar farm 129 Announced Solar 20.9 km 50
Gado Bravo solar farm 5 Announced Solar 21.0 km 50
Gado Bravo solar farm 4 Announced Solar 21.5 km 50
Lagoa Grande solar farm 7 Announced Solar 22.1 km 55.7
Lagoa Grande solar farm 12 Announced Solar 22.2 km 55.7
Sol de Jana solar farm 3 Announced Solar 22.3 km 38.8
Gado Bravo solar farm 6 Announced Solar 22.4 km 37.5
Lagoa Grande solar farm 11 Announced Solar 22.8 km 55.7
Sol de Jana solar farm 2 Announced Solar 22.9 km 38.8
Lagoa Grande solar farm 8 Announced Solar 23.1 km 55.7
Gado Bravo solar farm 7 Announced Solar 23.3 km 37.5
Sol de Jana solar farm 1 Announced Solar 23.4 km 38.8
Lagoa Grande solar farm 6 Announced Solar 23.4 km 55.7
Sol de Jana solar farm 5 Announced Solar 23.7 km 38.8
Sol de Jana solar farm 4 Announced Solar 23.9 km 38.8
Lagoa Grande solar farm 5 Announced Solar 23.9 km 55.7
Gado Bravo solar farm 8 Announced Solar 24.2 km 37.5
Lagoa Grande solar farm 13 Announced Solar 24.2 km 55.7
Lagoa Grande solar farm 10 Announced Solar 24.2 km 60.6
Sol de Jana solar farm 6 Announced Solar 24.3 km 38.8
Lagoa Grande solar farm 3 Announced Solar 24.5 km 55.7
Lagoa Grande solar farm 1 Announced Solar 24.5 km 55.7
Lagoa Grande solar farm 14 Announced Solar 24.8 km 55.7

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution