Putnam Meadow Solar Station: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Putnam Meadow Solar Station
Solar
Key facts
Solar Filed (source status: (L) Regulatory approvals pending. Not under construction) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Interconnection queue
- ISO-NE
- In-service date
- (stated)
- Location
- Windham County, Connecticut
Details
Who’s behind it
- Developer
- Putnam Meadow Solar Station, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar Photovoltaic”
- EIA plant
- 65710 generator PTNM
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as filed in EIA-860M (source status: “(L) Regulatory approvals pending. Not under construction”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2027-03-01 → 2027-04-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| KCE CT 1, LLC Announced | Storage | 1.6 mi | 45 |
| Killingly Energy Center Postponed | Gas, combined cycle | 2.7 mi | 843 |
| Pure Hedge LLC Under construction | Solar + storage | 13.9 mi | 90 |
Sources EIA-860M