Show on map
Raven Sol Solar CSGUSS Fletcher Solar — Under construction · Solar · NM · 1.7 MW · 0.3 mi awaySOLAR DATA CENTER WHITE HORSE RANCH — Under construction · Large load · NM · 12.1 mi away
  • Wind & solar
  • Loads
  • Under construction
  • Size not stated
  • 10 · 100 · 1,000 MW

Raven Sol Solar CSG

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Interconnection queue
Public Service Company of New Mexico (PNM)
In-service date
(stated)
Location
Hidalgo County, New Mexico

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
EIA plant
70586 generator RAVEN

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).
  • First published from EIA-860M Preliminary Monthly Electric Generator Inventory.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
USS Fletcher Solar Under construction Solar 0.3 mi 1.7
SOLAR DATA CENTER WHITE HORSE RANCH Under construction Large load 12.1 mi

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution