Show on map
RCWMD Badlands Landfill Gas ProjectEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 7.6 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 8.4 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 8.6 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 8.8 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 9.7 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 9.7 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 10.1 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 10.5 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 12.7 mi away
  • Combustion
  • Wind & solar
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

RCWMD Badlands Landfill Gas Project

Biomass

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Riverside County, California

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Kind
Generation
Technology
Biomass source: “Landfill Gas”
EIA plant
55820 generator GEN2

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).
About these dates

“Stated” dates are the source’s plan, not a commitment.

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Energy Center Announced Gas, combustion turbine 7.6 mi 0.9
Lake Perris Solar Postponed Solar 8.4 mi 1.5
San Jacinto Solar Postponed Solar 8.6 mi 1.5
Amazon - Moreno Valley Postponed Solar 8.8 mi 2.2
Perris DC 5 - sline015 Under construction Solar 9.7 mi 1.6
Redlands DC 9 - sline609 Under construction Solar + storage 9.7 mi 5
Solar Photovoltaic Project #20 Postponed Solar 10.1 mi 3.5
SunE Redlands Postponed Solar 10.5 mi 1.5
Solar Photovoltaic Project #28 Postponed Solar 12.7 mi 0.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution