Show on map
Solar Photovoltaic Project #20Redlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 0.4 mi awaySunE Redlands — Postponed · Solar · CA · 1.5 MW · 2.5 mi awayEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 2.9 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 4.1 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 10.0 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 10.1 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 10.3 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 10.3 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 11.5 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 12.8 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 12.8 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 12.8 mi away
  • Combustion
  • Wind & solar
  • Bioenergy
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Solar Photovoltaic Project #20

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
San Bernardino County, California

Details

Who’s behind it

Developer
Southern California Edison Co · part of Edison InternationalOwnership claimOwnership link recorded from its source; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
Capacity (MW)
3.5 Capacity is the sum of the 7 generators listed under Sources.
EIA plant
57234 7 generatorsEIA generatorsPlant 57234 S020A, S020B, S020C, S020D, S020E, S020F, S020G

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Redlands DC 9 - sline609 Under construction Solar + storage 0.4 mi 5
SunE Redlands Postponed Solar 2.5 mi 1.5
Energy Center Announced Gas, combustion turbine 2.9 mi 0.9
Solar Photovoltaic Project #28 Postponed Solar 4.1 mi 0.5
OES Biogas Power Under construction Biomass 10.0 mi 2.6
RCWMD Badlands Landfill Gas Project Postponed Biomass 10.1 mi 1.2
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 10.3 mi 3
Solar Photovoltaic Project #24 Postponed Solar 10.3 mi 4
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 11.5 mi 4
Solar Photovoltaic Project #27 Postponed Solar 12.8 mi 1
Solar Photovoltaic Project #25 Postponed Solar 12.8 mi 4.5
Solar Photovoltaic Project #30 Postponed Solar 12.8 mi 1.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution