Show on map

Exact site not public

Red Holly Solar

Solar + storage

Capacity
Capacity: sourceERCOT · Open licenseMW
Queue position
21INR0022, 21INR0033
In-service date
(stated)
Location
Dawson County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Solar - Photovoltaic Solar + Other - Battery Energy Storage”
Capacity (MW)
310 Capacity is the sum of the 2 interconnection requests listed under Sources.
Connects at
tap 345kV 59900 Longdraw - 79641 FarmlandConnection point360 MW active (2 of 2 projects).

At this site

2 records at Red Holly SolarAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Red Holly Solar this record Solar + storage 310 Contracted
Another phase medium confidence Red Holly Storage 1 Storage 50 Contracted

Sources ERCOT

Sources

  • ERCOTTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Stated In-service date stated by ERCOT.
  • Observed as contracted in ERCOT (source status: “Completed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources ERCOT

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026

Every source and license · Attribution