Rexford 2 Solar Farm
Solar + storage
- Capacity
- Capacity: sourceCAISO · Open license, with creditMW
- Queue position
- 1789
- In-service date
- (stated)
- Location
- Tulare County, California
Details
Who’s behind it
- Developer
- 22SV 8ME LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Capacity (MW)
- 200 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 400 MW nameplate.
- Connects at
- Vestal Substation 230 kVConnection point400 MW active (2 of 8 projects).
- EIA plant
- 68485 2 generatorsEIA generatorsPlant 68485 22SVA, 22SVB
At this site
2 records at REXFORD SOLAR FARMAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | REXFORD SOLAR FARM | Solar + storage | 300 | Built |
| Another phase medium confidence | Rexford 2 Solar Farm this record | Solar + storage | 200 | Contracted |
Also at this interconnection point (6)
Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.
- SEQUOIA Solar + storage, 200 MW, permitted at Vestal Substation 230 kV
- ALL AMERICAN SOLAR Solar, 400 MW, withdrawn at Vestal Substation 230 kV
- WRE - VESTAL (49/480MW) Solar, 320 MW, withdrawn at Vestal Substation 230 kV
- TRIUMPH SOLAR Solar + storage, 300 MW, withdrawn at Vestal Substation 230 kV
- GILMORE SOLAR Solar + storage, 200 MW, withdrawn at Vestal Substation 230 kV
- CALHAWK SOLAR FARM Solar + storage, 99 MW, withdrawn at Vestal Substation 230 kV
Timeline
- Stated In-service date stated by CAISO.
- Observed as contracted in CAISO.
- CAISO Public Queue Report: Proposed cod 2027-07-01 → 2028-12-30.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
2 sourcesAround this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Ranch 4701 Under construction | Solar | 10.4 mi | 2.3 |
| Solar Photovoltaic Project #35 Postponed | Solar | 13.1 mi | 7 |
| Solar Photovoltaic Project #46 Postponed | Solar | 13.3 mi | 3.5 |
Sources EIA-860M