Show on map
- Storage
- Loads
- In development
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Storage
- Loads
- In development
- Size not stated
Richwood Solar and Storage: the source's site coordinate and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Richwood Solar and Storage
Storage
Key facts
Storage Announced (source status: (P) Planned for installation, but regulatory approvals not initiated) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Union County, Ohio
Details
Who’s behind it
- Developer
- Samsung C&T Renewables, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Batteries”
- EIA plant
- 68019 generator RICBA
At this site
2 records at Richwood Solar and StorageAt this siteGrouped by the same EIA plant id. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Richwood Solar and Storage this record | Storage | 50 | Announced |
| Unit of EIA plant 68019 high confidence | Richwood Solar and Storage | Solar | 250 | Postponed |
Sources EIA-860M
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as announced in EIA-860M (source status: “(P) Planned for installation, but regulatory approvals not initiated”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Richwood Solar and Storage Postponed | Solar | 0.0 mi | 250 |
| Light Pole 2 (Marysville data centre) Filed | Large load | 8.3 mi | |
| Building B (Marysville data centre) Filed | Large load | 9.2 mi |
Sources EIA-860M · FAA OE/AAA