Show on map
- Wind & solar
- Storage
- In development
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
Rosamond South II: the source's site coordinate and 11 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Rosamond South II
Storage
Key facts
Storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Kern County, California
Details
Who’s behind it
- Developer
- Golden Fields Solar VI, LLC
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Kind
- Storage source: “Batteries”
- Capacity (MW)
- 140 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 69648 2 generatorsEIA generatorsPlant 69648 BSBA2, RSBA
Timeline
- Stated In-service date stated by EIA-860M.
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-11-01 → 2027-03-01.
About these dates
“Stated” dates are the source’s plan, not a commitment.
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Solar Star 3 Under construction | Solar + storage | 1.5 mi | 24 |
| Solar Star 4 Under construction | Solar + storage | 1.5 mi | 24 |
| Camino Solar Hybrid Postponed | Storage | 5.4 mi | 11 |
| Alpine Solar Withdrawn | Solar | 6.0 mi | 66 |
| Gaskell West Storage 1, LLC Under construction | Storage | 6.7 mi | 21.6 |
| Syracuse and Tours Renewable Energy Permitted | Solar + storage | 9.7 mi | 80 |
| Neenach Solar Center Postponed | Solar | 10.0 mi | 1.5 |
| Antelope Solar Farm Postponed | Solar | 11.7 mi | 20 |
| Portal Ridge Solar A, LLC Postponed | Solar | 13.6 mi | 19 |
| Windhub Solar B, LLC Under construction | Solar | 14.4 mi | 26.4 |
| Tehachapi Wind Resource I Postponed | Wind | 14.6 mi | 0.6 |