Show on map
São Geraldo solar farm 7São Geraldo solar farm 3 — Announced · Solar · 48 MW · 0.6 km awaySão Geraldo solar farm 6 — Announced · Solar · 48 MW · 0.7 km awaySão Geraldo solar farm 4 — Announced · Solar · 48 MW · 0.8 km awaySão Geraldo solar farm 8 — Announced · Solar · 30 MW · 1.0 km awaySão Geraldo solar farm 1 — Announced · Solar · 48 MW · 1.2 km awaySão Geraldo solar farm 10 — Announced · Solar · 48 MW · 1.2 km awaySão Geraldo solar farm 14 — Announced · Solar · 48 MW · 1.4 km awaySão Geraldo solar farm 2 — Announced · Solar · 48 MW · 1.4 km awaySão Geraldo solar farm 5 — Announced · Solar · 48 MW · 1.7 km awaySão Geraldo solar farm 15 — Announced · Solar · 48 MW · 1.7 km awaySão Geraldo solar farm 13 — Announced · Solar · 48 MW · 1.7 km awaySão Geraldo solar farm 9 — Announced · Solar · 48 MW · 1.9 km awaySão Geraldo solar farm 12 — Announced · Solar · 48 MW · 2.2 km awaySão Geraldo solar farm 16 — Announced · Solar · 30 MW · 2.6 km awaySão Geraldo solar farm 11 — Announced · Solar · 48 MW · 2.8 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

São Geraldo solar farm 7

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Minas Gerais, Brazil

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
São Geraldo solar farm 3 Announced Solar 0.6 km 48
São Geraldo solar farm 6 Announced Solar 0.7 km 48
São Geraldo solar farm 4 Announced Solar 0.8 km 48
São Geraldo solar farm 8 Announced Solar 1.0 km 30
São Geraldo solar farm 1 Announced Solar 1.2 km 48
São Geraldo solar farm 10 Announced Solar 1.2 km 48
São Geraldo solar farm 14 Announced Solar 1.4 km 48
São Geraldo solar farm 2 Announced Solar 1.4 km 48
São Geraldo solar farm 5 Announced Solar 1.7 km 48
São Geraldo solar farm 15 Announced Solar 1.7 km 48
São Geraldo solar farm 13 Announced Solar 1.7 km 48
São Geraldo solar farm 9 Announced Solar 1.9 km 48
São Geraldo solar farm 12 Announced Solar 2.2 km 48
São Geraldo solar farm 16 Announced Solar 2.6 km 30
São Geraldo solar farm 11 Announced Solar 2.8 km 48

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution