- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Sanborn Hybrid 3: the source's site coordinate. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Sanborn Hybrid 3
Solar + storage
Key facts
Solar + storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Queue position
- 1632
- In-service date
- (stated)
- Location
- Kern County, California
Sources
-
View at source →
EIA-860M · 4 records (69956-S10PV, 69956-S10BS, 69956-S8, …)
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
-
View at source →
CAISO ·
CAISO Public Queue Report
Source: California ISO · license
CAISO Terms of Use (rev. 2025-05-14), retrieved 2026-09-12 — "No material or information from this Website ... may be copied, reproduced, republished ... except (i) as authorized in these Terms of Use"; and "may be used by you provided that you keep intact all copyright ... notices and that you credit the California ISO"
Summary only: the source’s license keeps the full record at the source.
Units and requests (5)
How these combine
This project is one site. Each row is one unit or request a register lists for it: a generator in EIA-860M, a stage in NESO’s register, a request in a grid queue. Capacity is the live interconnection requests’ MW added up where there are any, plus any listed generator of a technology no request covers; otherwise the generators’ MW added up. The status is the most advanced any row reports; a withdrawn row ends the project only when no other row carries it on.
| Source | Record | Name | Technology | MW | Status | Proposed COD |
|---|---|---|---|---|---|---|
| CAISO Request | — | SANBORN HYBRID 3 | Solar + storage | 1,400 | Contracted | Dec 31, 2026 |
| EIA-860M Generator | 69956-S10PV | Sanborn Hybrid 3 | Solar | 210 | Under construction “(U) Under construction, less than or equal to 50 percent complete” | Dec 1, 2026 |
| EIA-860M Generator | 69956-S10BS | Sanborn Hybrid 3 | Storage | 210 | Under construction “(U) Under construction, less than or equal to 50 percent complete” | Dec 1, 2026 |
| EIA-860M Generator | 69956-S9 | Sanborn Hybrid 3 | Solar | 103 | Under construction “(U) Under construction, less than or equal to 50 percent complete” | Dec 1, 2026 |
| EIA-860M Generator | 69956-S8 | Sanborn Hybrid 3 | Solar | 55 | Under construction “(V) Under construction, more than 50 percent complete” | Oct 1, 2026 |