Sanborn Hybrid 3Bellefield 2 Solar & Energy Storage Farm — Under construction · Solar + storage · CA · 500 MW · 3.0 mi awayAratina Solar Center 2 — Under construction · Solar + storage · CA · 200 MW · 4.9 mi awayTehachapi Spindle — Withdrawn · Storage · CA · 20 MW · 5.7 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 6.3 mi awayBellefield 3 Solar and Battery Storage — Contracted · Solar + storage · CA · 150 MW · 7.2 mi awayWindhub Solar B, LLC — Under construction · Solar · CA · 26.4 MW · 8.9 mi awaySyracuse and Tours Renewable Energy — Permitted · Solar + storage · CA · 80 MW · 11.4 mi awayBig Creek Solar LLC — Under construction · Solar · AR · 400 MW · 12.1 mi awayBolthouse Solar LLC — Postponed · Solar · CA · 3 MW · 13.1 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Sanborn Hybrid 3

Solar + storage

Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
Kern County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Capacity (MW)
1,400 Capacity is the interconnection request in CAISO Public Queue Report. The 4 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 578 MW nameplate.
Connects at
Windhub Substation 500kVConnection point1,750 MW active (2 of 5 projects).
EIA plant
69956 4 generatorsEIA generatorsPlant 69956 S10BS, S10PV, S8, S9

Timeline

  • Stated In-service date stated by EIA-860M.
  • Observed as under construction in EIA-860M (source status: “(U) Under construction, less than or equal to 50 percent complete”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bellefield 2 Solar & Energy Storage Farm Under construction Solar + storage 3.0 mi 500
Aratina Solar Center 2 Under construction Solar + storage 4.9 mi 200
Tehachapi Spindle Withdrawn Storage 5.7 mi 20
Willow Rock Energy Storage Center Contracted Storage 6.3 mi 500
Bellefield 3 Solar and Battery Storage Contracted Solar + storage 7.2 mi 150
Windhub Solar B, LLC Under construction Solar 8.9 mi 26.4
Syracuse and Tours Renewable Energy Permitted Solar + storage 11.4 mi 80
Big Creek Solar LLC Under construction Solar 12.1 mi 400
Bolthouse Solar LLC Postponed Solar 13.1 mi 3

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution