Show on map
- Wind & solar
- Under construction
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
Sanger USD - Sanger West HS: the source's site coordinate and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Sanger USD - Sanger West HS
Solar + storage
Key facts
Solar + storage Under construction (source status: (V) Under construction, more than 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Fresno County, California
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar + storage source: “Solar Photovoltaic + Batteries”
- Capacity (MW)
- 1.4 Capacity is the sum of the 2 generators listed under Sources.
- EIA plant
- 69713 2 generatorsEIA generatorsPlant 69713 9985B, 9985C
Timeline
- Observed as under construction in EIA-860M (source status: “(V) Under construction, more than 50 percent complete”).
- Stated In-service date stated by EIA-860M.
- EIA-860M Preliminary Monthly Electric Generator Inventory: Proposed cod 2026-10-01 → 2026-11-01.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.
Sources
1 sourceSources EIA-860M
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Energy Nuevo Storage Farm Withdrawn | Storage | 11.2 mi | 20 |