Show on map
Exact site not public
Map
SCHNEIDER GAS RICE PHASE 2 in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Schneider Gas Rice Phase 2
Gas, reciprocating engine
As filed: SCHNEIDER GAS RICE PHASE 2
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 31INR0013
- In-service date
- (stated)
- Location
- Caldwell County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- LCRA
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Gas, reciprocating engine source: “Gas - Internal Combustion Engine, eg. Reciprocating”
- Connects at
- Double Tap 345kV #7042 Zorn - #7040 Austrop and #7042 Zorn - #9074 Lytton SpringsConnection point1,106 MW active (3 of 3 projects).
At this site
3 records at SCHNEIDER COMBINED CYCLEAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | SCHNEIDER COMBINED CYCLE | Gas, combined cycle | 880 | Contracted |
| Same site, relation unclear low confidence | SCHNEIDER GAS RICE | Gas, reciprocating engine | 113 | Contracted |
| Same site, relation unclear low confidence | SCHNEIDER GAS RICE PHASE 2 this record | Gas, reciprocating engine | 113 | Contracted |
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources ERCOT