Show on map
Schwieberdingen 2 solar project --ABR993949105847 solar project -- — Announced · Solar · 2.5 MW · 2.3 km awayTRUMPF Areal 3 Ditzingen (3.01,3.02,3.03, 4.01) solar project -- — Announced · Solar · 1.4 MW · 8.0 km awayTRUMPF Areal 4 Ditzingen (3.06, 3.07, 3.08, PH3.1, 4.03, 4.04, 4.05) solar project -- — Announced · Solar · 2.8 MW · 8.2 km awayMERC016 Bad Canstatt solar project -- — Announced · Solar · 3.5 MW · 14.2 km awayMERC015 solar project -- — Announced · Solar · 1.1 MW · 15.3 km awayBELA013 (Sindelfingen 56) solar project -- — Announced · Solar · 1.5 MW · 22.5 km awayW20 B56 PV Parkhaus solar project -- — Announced · Solar · 1 MW · 22.7 km awayBELA012 (Sindelfingen 48/1) solar project -- — Announced · Solar · 1.1 MW · 22.8 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Schwieberdingen 2 solar project --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Baden-Württemberg, Germany

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
ABR993949105847 solar project -- Announced Solar 2.3 km 2.5
TRUMPF Areal 3 Ditzingen (3.01,3.02,3.03, 4.01) solar project -- Announced Solar 8.0 km 1.4
TRUMPF Areal 4 Ditzingen (3.06, 3.07, 3.08, PH3.1, 4.03, 4.04, 4.05) solar project -- Announced Solar 8.2 km 2.8
MERC016 Bad Canstatt solar project -- Announced Solar 14.2 km 3.5
MERC015 solar project -- Announced Solar 15.3 km 1.1
BELA013 (Sindelfingen 56) solar project -- Announced Solar 22.5 km 1.5
W20 B56 PV Parkhaus solar project -- Announced Solar 22.7 km 1
BELA012 (Sindelfingen 48/1) solar project -- Announced Solar 22.8 km 1.1

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution