Exact site not public
Map
Scira-Dudgeon Extension in United Kingdom: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Scira-Dudgeon Extension
Offshore wind
- Capacity
- Capacity: sourceNESO · Open license, with creditMW
- Queue position
- PRO-000507-1, PRO-000507-3 and 1 more
- In-service date
- (stated)
- Location
- Norwich Main 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →
Sources
-
View at source →
NESO · 3 records (a0l4L0000005izYQAQ/2, a0l4L0000005izYQAQ/1, a0l4L0000005izYQAQ/3)
NESO Transmission Entry Capacity (TEC) Register
National Energy SO Open Data Licence v1.0 (based on OGL v3), retrieved 2026-09-12 — free to "exploit the Information commercially and non-commercially"; must "Acknowledge NESO as the source of the Information by including the following attribution statement: Supported by National Energy SO Open Data"
Supported by National Energy SO Open Data · license
Units and requests (3)
How these combine
This project is one site. Each row is one unit or request a register lists for it: a generator in EIA-860M, a stage in NESO’s register, a request in a grid queue. Capacity is the live interconnection requests’ MW added up where there are any, plus any listed generator of a technology no request covers; otherwise the generators’ MW added up. The status is the most advanced any row reports; a withdrawn row ends the project only when no other row carries it on.
| Source | Record | Name | Technology | MW | Status | Proposed COD |
|---|---|---|---|---|---|---|
| NESO Request | a0l4L0000005izYQAQ/1 | Scira-Dudgeon Extension | Offshore wind | 719 | Filed “Scoping” | Jan 1, 2030 |
| NESO Request | a0l4L0000005izYQAQ/3 | Scira-Dudgeon Extension | Offshore wind | 400 | Filed “Scoping” | Oct 1, 2034 |
| NESO Request | a0l4L0000005izYQAQ/2 | Scira-Dudgeon Extension | Offshore wind | 231 | Filed “Scoping” | Oct 31, 2031 |