Sherbino II BESS SLF
Storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 26INR0296
- In-service date
- (stated)
- Location
- Pecos County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Phoenix Battery Storage, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage source: “Other - Battery Energy Storage”
- Connects at
- 38430 TNMP White baker Switching Station 138kVConnection point77.4 MW active (1 of 1 projects).
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
- ERCOT GIS Report (Generator Interconnection Status): Proposed cod 2027-04-19 → 2028-04-18.
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.