Show on map
Sienna 2 Solar and Storage ProjectSienna Solar Farm — Contracted · Solar + storage · CA · 200 MW · 1.7 mi awayOrd Mountain Solar — Withdrawn · Solar · CA · 60 MW · 4.4 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Sienna 2 Solar and Storage Project

Solar + storage

Key facts

Solar + storage Studied (what this status means)
Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
San Bernardino County, California

Details

Who’s behind it

Developer
44ST 8ME LLC

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Capacity (MW)
55 Capacity is the interconnection request in CAISO Public Queue Report. The 2 generators listed in EIA-860M Preliminary Monthly Electric Generator Inventory (listed under Sources) total 110 MW nameplate.
Connects at
Calcite Substation 230 kVConnection point255 MW active (2 of 3 projects).
EIA plant
68486 2 generatorsEIA generatorsPlant 68486 44STA, 44STB

Timeline

  • Stated In-service date stated by CAISO.
  • Observed as studied in CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sienna Solar Farm Contracted Solar + storage 1.7 mi 200
Ord Mountain Solar Withdrawn Solar 4.4 mi 60

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO

Attribution