Soda Lake BESS 2 SLF in Texas: the ring is the region's center, not the site. Outline: Natural Earth and US Census Bureau, both public domain.
Soda Lake BESS 2 SLF
Solar + storage
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 24INR0383, 23INR0080
- In-service date
- (stated)
- Location
- Crane County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Crane II Solar Electric, LLC
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Storage
- Technology
- Solar + storage source: “Other - Battery Energy Storage + Solar - Photovoltaic Solar”
- Capacity (MW)
- 407.1 Capacity is the sum of the 2 interconnection requests listed under Sources.
- Connects at
- 138 kV Soda Lake (#76026)Connection point813.9 MW active (2 of 2 projects).
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.