Show on map
Solar Photovoltaic Project #41Solar Photovoltaic Project #40 — Postponed · Solar · CA · 10 MW · 0.0 mi awayMinneola Solar — Under construction · Solar · CA · 3 MW · 5.5 mi away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

Solar Photovoltaic Project #41

Solar

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
San Bernardino County, California

Details

Who’s behind it

Developer
Southern California Edison Co · part of Edison InternationalOwnership claimOwnership link recorded from its source; no date stated by the source.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
Capacity (MW)
10 Capacity is the sum of the 20 generators listed under Sources.
EIA plant
57539 20 generatorsEIA generatorsPlant 57539 S41A, S41B, S41C, S41D, S41E, S41F, S41G, S41H, S41I, S41J, S41K, S41L, S41M, S41N, S41O, S41P, S41Q, S41R, S41S, S41T

At this site

2 records at Solar Photovoltaic Project #40At this siteGrouped by the same exact location and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Solar Photovoltaic Project #40 Solar 10 Postponed
Same site, relation unclear low confidence Solar Photovoltaic Project #41 this record Solar 10 Postponed

Sources EIA-860M

Sources

  • EIA-860MTerms of use · retrieved Nov 4, 2026

Attribution

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Solar Photovoltaic Project #40 Postponed Solar 0.0 mi 10
Minneola Solar Under construction Solar 5.5 mi 3

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution