Show on map
Solaris (Pacto) solar farm 109Solaris (Pacto) solar farm 110 — Announced · Solar · 28.1 MW · 5.5 km awaySolaris (Pacto) solar farm 116 — Announced · Solar · 50 MW · 6.1 km awaySolaris (Pacto) solar farm 108 — Announced · Solar · 50 MW · 8.4 km awaySolaris (Pacto) solar farm 115 — Announced · Solar · 50 MW · 10.5 km awaySolaris (Pacto) solar farm 113 — Announced · Solar · 50 MW · 13.5 km awaySolaris (Pacto) solar farm 107 — Announced · Solar · 50 MW · 14.5 km awaySolaris (Pacto) solar farm 114 — Announced · Solar · 50 MW · 17.1 km awayWalfrido Avila solar farm 7 — Announced · Solar · 50 MW · 17.6 km awayWalfrido Avila solar farm 39 — Announced · Solar · 50 MW · 18.1 km awayWalfrido Avila solar farm 38 — Announced · Solar · 50 MW · 22.2 km awaySolaris (Pacto) solar farm 112 — Announced · Solar · 50 MW · 23.1 km awayWalfrido Avila solar farm 37 — Announced · Solar · 50 MW · 23.2 km awayWalfrido Avila solar farm 40 — Announced · Solar · 50 MW · 23.5 km awayWalfrido Avila solar farm 20 — Announced · Solar · 50 MW · 23.5 km awayWalfrido Avila solar farm 8 — Announced · Solar · 50 MW · 23.9 km awaySolaris (Pacto) solar farm 111 — Announced · Solar · 50 MW · 24.2 km awayWalfrido Avila solar farm 35 — Announced · Solar · 50 MW · 24.5 km awaySolaris (Pacto) solar farm 105 — Announced · Solar · 50 MW · 25.0 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Solaris (Pacto) solar farm 109

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Minas Gerais, Brazil

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Solaris (Pacto) solar farm 110 Announced Solar 5.5 km 28.1
Solaris (Pacto) solar farm 116 Announced Solar 6.1 km 50
Solaris (Pacto) solar farm 108 Announced Solar 8.4 km 50
Solaris (Pacto) solar farm 115 Announced Solar 10.5 km 50
Solaris (Pacto) solar farm 113 Announced Solar 13.5 km 50
Solaris (Pacto) solar farm 107 Announced Solar 14.5 km 50
Solaris (Pacto) solar farm 114 Announced Solar 17.1 km 50
Walfrido Avila solar farm 7 Announced Solar 17.6 km 50
Walfrido Avila solar farm 39 Announced Solar 18.1 km 50
Walfrido Avila solar farm 38 Announced Solar 22.2 km 50
Solaris (Pacto) solar farm 112 Announced Solar 23.1 km 50
Walfrido Avila solar farm 37 Announced Solar 23.2 km 50
Walfrido Avila solar farm 40 Announced Solar 23.5 km 50
Walfrido Avila solar farm 20 Announced Solar 23.5 km 50
Walfrido Avila solar farm 8 Announced Solar 23.9 km 50
Solaris (Pacto) solar farm 111 Announced Solar 24.2 km 50
Walfrido Avila solar farm 35 Announced Solar 24.5 km 50
Solaris (Pacto) solar farm 105 Announced Solar 25.0 km 50

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution