Show on map
Solarpark Steinach II P22274 solar project --Duisburg 4 solar project -- — Announced · Solar · 1.1 MW · 5.9 km awaySolarparkArhalm solar project -- — Announced · Solar · 16.9 MW · 15.3 km awaySolarpark Barbing solar project 3 — Announced · Solar · 2.9 MW · 21.2 km awayPVFreifläche Pilsting solar project -- — Announced · Solar · 2.8 MW · 23.0 km awayPV Freifläche Metten solar project -- — Announced · Solar · 2.5 MW · 23.6 km awaySolarpark Barbing solar project 2 — Announced · Solar · 15 MW · 23.9 km away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Solarpark Steinach II P22274 solar project --

Solar

Capacity
Capacity: sourceGlobal Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) · Open license, with creditMW
Location
Bayern, Germany

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “utility-scale solar / PV”

Timeline

  • Observed as announced in GEM (source status: “pre-construction”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Sources

1 source

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Duisburg 4 solar project -- Announced Solar 5.9 km 1.1
SolarparkArhalm solar project -- Announced Solar 15.3 km 16.9
Solarpark Barbing solar project 3 Announced Solar 21.2 km 2.9
PVFreifläche Pilsting solar project -- Announced Solar 23.0 km 2.8
PV Freifläche Metten solar project -- Announced Solar 23.6 km 2.5
Solarpark Barbing solar project 2 Announced Solar 23.9 km 15

Sources GEM

Sources

  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.

Attribution