Sonoran West Solar EGSChuckawalla State Prison — Postponed · Solar · CA · 2.1 MW · 3.0 mi awayIronwood State Prison — Postponed · Solar · CA · 1.1 MW · 3.2 mi awayBlythe Solar Power Project — Withdrawn · Solar thermal · CA · 796.8 MW · 9.4 mi awayRio Mesa SEGF 2 — Postponed · Solar thermal · CA · 250 MW · 10.7 mi awaySonoran Energy Project — Postponed · Gas, combined cycle · CA · 553 MW · 11.5 mi awayGrace Energy Center — Contracted · Solar + storage · CA · 500 MW · 11.7 mi awayRio Mesa Solar Facility 1 — Postponed · Solar thermal · CA · 250 MW · 12.0 mi awayLycan Solar Project — Contracted · Solar + storage · CA · 400 MW · 12.0 mi away
  • Wind & solar
  • In development
  • 10 · 100 · 1,000 MW

Sonoran West Solar EGS

Solar

Capacity
Capacity: sourceCAISO · Open license, with creditMW
In-service date
(stated)
Location
Riverside County, California

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar source: “Solar Photovoltaic”
Connects at
Colorado River Substation 500kVConnection point0 MW active (0 of 4 projects).
EIA plant
59202 generator 1

At this site

2 records at Sonoran West Solar EGSAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Sonoran West Solar EGS this record Solar 540 Withdrawn
Earlier filing, superseded low confidence SONORAN Solar 50 Withdrawn
Also at this interconnection point (2)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • GENESIS MCCOY Solar + storage, 500 MW, built at Colorado River Substation 500kV
  • SOLO Solar + storage, 500 MW, withdrawn at Colorado River Substation 500kV

Sources EIA-860M · CAISO

Sources

Attribution

Timeline

  • Observed as withdrawn in CAISO.
  • Stated In-service date stated by CAISO.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Chuckawalla State Prison Postponed Solar 3.0 mi 2.1
Ironwood State Prison Postponed Solar 3.2 mi 1.1
Blythe Solar Power Project Withdrawn Solar thermal 9.4 mi 796.8
Rio Mesa SEGF 2 Postponed Solar thermal 10.7 mi 250
Sonoran Energy Project Postponed Gas, combined cycle 11.5 mi 553
Grace Energy Center Contracted Solar + storage 11.7 mi 500
Rio Mesa Solar Facility 1 Postponed Solar thermal 12.0 mi 250
Lycan Solar Project Contracted Solar + storage 12.0 mi 400

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 20, 2026Source: California ISO

Attribution