Southfields

overdue by 1.4 years (target Jun 30, 2025)

Solar + storage

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-001632
In-service date
(stated)
Location
Minety 400kV Substation, United Kingdom (exact site not stated)EstimateEstimated from the connection substation. The source names the connection substation, not the site. Source: NESO. How we estimate →

Details

Who’s behind it

Developer
PD688IRO Ltd

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Solar + storage source: “Energy Storage System;PV Array (Photo Voltaic/solar)”
Connects at
Minety 400kV SubstationConnection point427.5 MW active (9 of 9 projects).

At this site

5 records at Pond Hill Farm 2 BESSAt this siteGrouped by the same grid connection point and developer. The lead is the largest active filing. Each record keeps its own page.

Records at this site: the lead first; each plant's units follow it; every other record with its relationship to the lead.
RelationshipNameTechnologyMWStatus
Lead filing Pond Hill Farm 2 BESS Storage 47.5 Permitted
Another phase high confidence Pond Hill Farm 1 Storage 47.5 Permitted
Same site, relation unclear low confidence Somerford Solar + storage 47.5 Permitted
Same site, relation unclear low confidence Southfields this record Solar + storage 47.5 Studied
Same site, relation unclear low confidence Southfields Farm Storage 47.5 Permitted
Also at this interconnection point (4)

Other requests at the same grid connection point, from another or no named developer. They share the connection, not the site.

  • Dog Trap Lane Storage, 47.5 MW, permitted at Minety 400kV Substation
  • Fairholme BESS Storage, 47.5 MW, permitted at Minety 400kV Substation
  • JBM Solar -Minety Solar + storage, 47.5 MW, filed at Minety 400kV Substation
  • Minety Storage, 47.5 MW, permitted at Minety 400kV Substation

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOTerms of use · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Attribution

Timeline

  • Observed as studied in NESO (source status: “Awaiting Consents”).
  • Stated In-service date stated by NESO. Passed 1.4 years ago; NESO still says studied.

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status and dates as the source last listed them. Later changes follow as we see them.

Overdue: the stated date is more than 90 days past. Some sources stop updating dates once a project is built.

Sources

1 source

Sources NESO

Supported by National Energy SO Open Data

Sources

  • NESOOpen license, with credit · retrieved Nov 13, 2026Supported by National Energy SO Open Data

Every source and license · Attribution

View at source

Report a problem