Show on map
SPITTALWatten Wind Farm — Wind · 52.8 MW · 6.4 km awayCastletown - wind farm -- — Wind · 9.6 MW · 7.1 km awayTormsdale Windfarm — Solar + storage · 70 MW · 9.0 km awayLand near Tacher, Latheron wind farm -- — Wind · 4.1 MW · 9.2 km awayTacher B wind farm -- — Wind · 4.1 MW · 9.2 km awayTacher wind farm C — Wind · 4.1 MW · 9.2 km awayBlandford Hill wind farm -- — Wind · 4.5 MW · 9.4 km awayCogle Moss Wind Farm — Wind · 36 MW · 9.6 km awayLower Longstones, St Mewan Wind Turbine -- — Wind · 4.6 MW · 9.6 km awayHill Of Ochiltree wind farm -- — Wind · 8 MW · 10.8 km awaySlickly Wind Farm — Wind + storage · 114 MW · 14.3 km awayScoolary wind farm -- — Wind · 120 MW · 17.0 km awaySouth Shebster wind farm -- — Wind · 10 MW · 17.4 km awayCairnmore Hill Wind Farm — Wind · 36 MW · 18.0 km awayHollandmey Renewable Energy Development — Wind · 49.5 MW · 18.4 km awayLower Rumster wind farm 1 — Wind · 1 MW · 19.8 km awayLower Rumster wind farm 2 — Wind · 1 MW · 19.8 km awayForss wind farm 3 — Wind · 4.5 MW · 20.5 km awayForss II Forss III) wind farm -- — Wind · 6.5 MW · 20.8 km awayHill Of Lynchrobbie, Dunbeath wind farm -- — Wind · 7.2 MW · 21.8 km awayStrensham Wind Cluster -- — Wind · 6.9 MW · 23.5 km awayHill Of Lychrobbie wind farm -- — Wind · 2.4 MW · 24.0 km away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • 10 · 100 · 1,000 MW

Storage

As filed: SPITTAL

Capacity
Capacity: sourceNESO · Open license, with creditMW
Queue position
PRO-003687
In-service date
(stated)
Location
Scotland, United Kingdom

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Storage source: “Energy Storage System”
Capacity (MW)
49.9 Capacity is the interconnection request in NESO Transmission Entry Capacity (TEC) Register. The 1 generator listed in Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses) (listed under Sources) total 21 MW nameplate.
Connects at
Mybster 2 132/33kV SubstationConnection point85.9 MW active (2 of 2 projects).

Timeline

  • Stated In-service date stated by NESO.
  • Observed as filed in NESO (source status: “Scoping”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

2 sources

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Watten Wind Farm Filed Wind 6.4 km 52.8
Castletown - wind farm -- Announced Wind 7.1 km 9.6
Tormsdale Windfarm Filed Solar + storage 9.0 km 70
Land near Tacher, Latheron wind farm -- Under construction Wind 9.2 km 4.1
Tacher B wind farm -- Announced Wind 9.2 km 4.1
Tacher wind farm C Announced Wind 9.2 km 4.1
Blandford Hill wind farm -- Cancelled Wind 9.4 km 4.5
Cogle Moss Wind Farm Filed Wind 9.6 km 36
Lower Longstones, St Mewan Wind Turbine -- Cancelled Wind 9.6 km 4.6
Hill Of Ochiltree wind farm -- Cancelled Wind 10.8 km 8
Slickly Wind Farm Permitted Wind + storage 14.3 km 114
Scoolary wind farm -- Cancelled Wind 17.0 km 120
South Shebster wind farm -- Cancelled Wind 17.4 km 10
Cairnmore Hill Wind Farm Studied Wind 18.0 km 36
Hollandmey Renewable Energy Development Permitted Wind 18.4 km 49.5
Lower Rumster wind farm 1 Announced Wind 19.8 km 1
Lower Rumster wind farm 2 Announced Wind 19.8 km 1
Forss wind farm 3 Announced Wind 20.5 km 4.5
Forss II Forss III) wind farm -- Unknown Wind 20.8 km 6.5
Hill Of Lynchrobbie, Dunbeath wind farm -- Announced Wind 21.8 km 7.2
Strensham Wind Cluster -- Cancelled Wind 23.5 km 6.9
Hill Of Lychrobbie wind farm -- Unknown Wind 24.0 km 2.4

Sources NESO · GEM

Supported by National Energy SO Open Data

Sources

Attribution