Spurland Solar II
Solar
- Capacity
- Capacity: sourceERCOT · Open licenseMW
- Queue position
- 29INR0195
- In-service date
- (stated)
- Location
- Dickens County, Texas (exact site not stated)EstimateEstimated from the county centroid. The source names the county, not the site. Source: ERCOT. How we estimate →
Details
Who’s behind it
- Developer
- Spurland Solar II
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Generation
- Technology
- Solar source: “Solar - Photovoltaic Solar”
- Connects at
- 59908 Nova Prime 345 345kVConnection point503.7 MW active (2 of 2 projects).
At this site
2 records at Spurland Solar IAt this siteGrouped by the same grid connection point and project name. The lead is the largest active filing. Each record keeps its own page.
| Relationship | Name | Technology | MW | Status |
|---|---|---|---|---|
| Lead filing | Spurland Solar I | Solar | 302.1 | Contracted |
| Another phase high confidence | Spurland Solar II this record | Solar | 201.6 | Contracted |
Sources ERCOT
Timeline
- Stated In-service date stated by ERCOT.
- Observed as contracted in ERCOT (source status: “Completed”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.