Show on map
- Loads
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Loads
- Under construction
- Operating
- Size not stated
STA1: the source's site coordinate and 12 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
STA1
Data center
- Kind
- Data center
- Location
- Bexar County, Texas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Kind
- Data center source: “Data Center”
- Capacity (MW)
- Not stated
- Selected as a data center because its industry code is NAICS 518210 (data processing and hosting). Some sites with this code are offices with a server room: 39 of 49 checked by hand were data centers. EPA ECHO ICIS-Air national facility download (data-centre selection, placed through FRS)
Timeline
- Observed as built in EPA ICIS-Air (source status: “Operating”).
“Stated” dates are the source’s plan, not a commitment.
About these dates
Status and dates as the source last listed them. Later changes follow as we see them.
Sources
1 sourceSources EPA ICIS-Air
Around this project
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| SPECIAL PROJ - SAT14 DATA CENT SHELL - BLDGS 1-3 Under construction | Large load | 0.8 mi | |
| MICROSOFT Built | Large load | 0.9 mi | |
| Vantage TX22 Built | Large load | 1.1 mi | |
| SAT2 SAT3 SAT4 Built | Large load | 1.2 mi | |
| STREAM DATACENTER Built | Large load | 1.8 mi | |
| EX WEST GREEN DATA CENTER Built | Large load | 3.0 mi | |
| AMAZON WEB SERVICE DATA CENTER Built | Large load | 3.1 mi | |
| AMAZON DATA CENTER SH 211 Built | Large load | 6.7 mi | |
| Vantage TX 12 Built | Large load | 7.0 mi | |
| Alamo 3 BESS 2 Postponed | Storage | 7.6 mi | 100 |
| SAT 40 DATA CENTER Built | Large load | 7.6 mi | |
| UTSA TEP II Postponed | Oil | 9.0 mi | 3 |
Sources EPA ICIS-NPDES · EPA ICIS-Air · FAA OE/AAA · EIA-860M