Steel River Solar Phase 2
Solar + storage
Key facts
Solar + storage Under construction (source status: (U) Under construction, less than or equal to 50 percent complete) (what this status means)- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- In-service date
- (stated)
- Location
- Mississippi County, Arkansas
Sources
-
View at source →
EIA-860M · 2 records (70398-SRSP2, 70398-SRSB2)
EIA-860M Preliminary Monthly Electric Generator Inventory
US federal work — public domain
Units and requests (2)
How these combine
This project is one site. Each row is one unit or request a register lists for it: a generator in EIA-860M, a stage in NESO’s register, a request in a grid queue. Capacity is the live interconnection requests’ MW added up where there are any, plus any listed generator of a technology no request covers; otherwise the generators’ MW added up. The status is the most advanced any row reports; a withdrawn row ends the project only when no other row carries it on.
| Source | Record | Name | Technology | MW | Status | Proposed COD |
|---|---|---|---|---|---|---|
| EIA-860M Generator | 70398-SRSP2 | Steel River Solar Phase 2 | Solar | 500 | Under construction “(U) Under construction, less than or equal to 50 percent complete” | Jul 1, 2029 |
| EIA-860M Generator | 70398-SRSB2 | Steel River Solar Phase 2 | Storage | 250 | Under construction “(U) Under construction, less than or equal to 50 percent complete” | Jul 1, 2029 |