Show on map
Subase Microgrid ProjectGroton Flanders Road Landfill — Under construction · Solar · CT · 5 MW · 3.9 mi awayCMEEC - Hollyhock Solar — Postponed · Solar · CT · 6 MW · 8.9 mi away
  • Wind & solar
  • Under construction
  • 10 · 100 · 1,000 MW

Subase Microgrid Project

Gas, reciprocating engine

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
New London County, Connecticut

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Capacity (MW)
13.1 Capacity is the sum of the 4 generators listed under Sources.
EIA plant
59701 4 generatorsEIA generatorsPlant 59701 SMP1, SMP2, SMP3, SMP4

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Groton Flanders Road Landfill Under construction Solar 3.9 mi 5
CMEEC - Hollyhock Solar Postponed Solar 8.9 mi 6

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution